索瑟文翻譯翻譯社 牆面隔板木匠工資Wall finish, partition, wood word labour cost
小計 Sub-Total
四涼氣工程 1.4 Mechanical Service
12T分手式1對1冷氣 1.4.1 2T Split Air Conditioning Unit
25T寒氣遷徙 1.4.2 5T A/C unit relocation
小計 Sub-Total
牆面隔板 - Wall Partition
參考資料
2009-04-02 15:13:48 彌補
八雜項工程 1.8 Miscellaneous
1空心木門改換200*2101.8.1 Replace hollow timber door 200 x 210
2空心木門替換172*2041.8.2 Replace hollow timber door 172 x 204
3空心木門81*206 1.8.3 Hollow timber door 81 x 206
4鋁窗90*270 1.8.4 Aluminum frame window 90 x 270
5釸酸鈣板隔間 1.8.5 Plaster board partition
參考資料
我
參考資料
參考資料
1溫控.按時節制台 1.11.2.1 Temperature, Time Control Unit
2加溫裝備 1.11.2.2 Heating Unit
3送風風扇組 1.11.2.3 Ventilation Fan Unit
4白鐵外框架 1.11.2.4 Galvanised iron outer frame
5固定鐵架 1.11.2.5 Fixed metal frame
(七)防水工程1.7 Water Proofing
我翻譯社 奇摩翻譯社 WWW
參考資料
2009-04-02 15:14:11 彌補
6洗手枱右高補葺 1.8.6 Hand basin repair
7原鐵門補綴 1.8.7 Repair on existing metal door.
8大廠加6'排水管 1.8.8 Install 6 water drain pipes for the factory
9天車拆遷組裝 1.8.9 Relocation and reassembly of existing crane
10鐵梯 1.8.10 Metal ladder
11資本收受接管站整修1.8.11 Recycling Station Repair and Maintenance
2009-04-02 15:15:50 增補
11原有牆面敲除清運1.10.11 Demolish existing wall finish and removal
12原有電力線修護1.10.12 Maintenance on existing electrical cables
13新設雕欄(40mx1.2m)2"方管1.10.13 Install new balustrade (40m x 1.2m翻譯社 2” SHS
14原有舊木門更換1.10.14 Replace existing timber door
15新斜坡(含模板組立灌漿)1.10.15 New ramp (include formwork and
參考資料
2009-04-02 16:07:04 補充
2009-04-02 15:11:51 彌補
三衛浴工程 1.3 Bathroom Fittings
1敲除及清運 1.3.1 Demolition and waste removal
2地磚(20*20) 1.3.2 Floor tile (20 x 20)
3壁磚(20*25) 1.3.3 Wall tile (20 x 25)
4熱固性強化脂板內及隔屏 1.3.4 Thermal setting reinforced boards and partitions
5PVC天花板 1.3.5 PVC ceiling tile
小計 Sub-Total
我
http://cpabm.cpami.gov.tw/search/bmd/InterDeco.jsp
ARCHITECTURE 建築,這部門很明瞭
(九)空壓機改換1.9 Air Compressor Replacement
噴漆懸空鐵鈎吊架- Suspended metal hook paint rack.
參考資料
參考資料
2009-04-02 15:49:49 彌補
(二)地坪加高工程1.2 Floor Re-levelling
滑軌扭轉噴漆吊架- Spin rack suspended track
google查過
2009-04-02 15:15:18 補充
5新設1B磚牆 1.10.5 New 1B block wall
6新設電動烤漆鐵捲門1.10.6 Install new electrical roller door
7移裝舊電動鐵捲門1.10.7 Remove existing electrical roller door
8新設分手式涼氣機3t1.10.8 Install new 3T split A/C unit
9原水電分區箱移裝1.10.9 Relocation of existing (????)
10新設t5燈組 1.10.10 Install new t5 type light fittings
參考資料
1抽風風鼓機 1.11.3.1 Air extraction unit
2圓形風管 1.11.3.2 Circular air duct
3方形出風口 1.11.3.3 Square Vent Air Grill
2009-04-02 15:12:23 彌補
13新換鋁門窗 1.3.13 Supply and install new aluminium frame door and window
14新設側鋁內扇 1.3.14 Ventilation Aluminium Louver
2009-04-02 16:02:58 增補
一鋼棚新建工程1.1 New Metal Frame Shed
1挖方及棄土1.1.1 Excavation and earth refill
2柱根本鋼筋及螺栓工程1.1.2 Column Footing, Steel reinforcement & Bolt Fixing
3H型鋼1.1.3 Steel H Section
4C型鋼 1.1.4 Steel C Section
53合一浪板1.1.5 Multi Layer Wafer Board
6鋁鋅清板1.1.6 Aluminium Zinc metal sheet
7烤漆快速捲門1.1.7 Galvanised Roller Room
8另料1.1.8 Other Materials
9工資1.1.9 Labour wages
10運費1.1.10 Transportation Cost
參考資料
fit out 的意思側重在物件的設置裝備擺設應用 如利用系統家具等
小計 Sub-Total
我
噴漆裝備配督工資Painting equipment setup labour cost
施工所在Project Site
1、土建工程:1. Refurbishment
工程名稱整修工程Refurbishment Project Name:
2009-04-02 15:49:00 補充
我
小計 Sub-Total
小計 Sub-Total
小計 Sub-total
小計 Sub Total
2009-04-02 15:16:54 補充
22清洗溝(15mx1mx20m)1.10.22 Floor Gully (15m x 1m x 20m)
23格柵板(15mx1m)1.10.23 Floor Gully Cover
25地坪粉光(所有新澆置地坪)1.10.25 Floor concrete polish (on all new concrete floor)
26牆面及矽酸鈣板面粉刷1.10.26 Wall finish and plaster board rendering
以你所說的營業範圍來講,我感覺Interior Design是對照恰當的